Second phosphoric rock warehouse

This project would increase the total storage for phosphate rock from 30 k to 100K tons. This is a step forward towards our sustainable development.

Project Image

Not started yet

Under development

Under Construction

Completed

This project utilizes space frame roof structures to eliminate central columns within the facility, resulting in a more open, unobstructed, and spacious workspace. This design enhancement significantly enhances operational workflow efficiency and provides increased flexibility in space utilization.

A critical component of the project is the installation of two ball mill units, each with a diameter of 2200 millimeters, used for grinding and controlling soil particle size distribution. These advanced grinding mills improve the precision and quality of the production process, thereby increasing operational efficiency and reducing overall production costs.

Moreover, this project significantly contributes to enhancing the storage infrastructure and optimizing soil resource management systems. It is expected to deliver substantial improvements in the operational performance and productivity of the related industrial units.

ParameterSpecification
Overall DimensionsWidth: 92 m, Length: 120 m, Height: 17 m
Concrete Volume10,000 cubic meters
Reinforcement steel 850 tons
Formatting12,000 square meters
Scaffolding Volume30,0000 cubic meters
Contractor Man-Hours135,000 man-hours
Work-Related Incidents0